S2K Commerce - Products Dropdown
S2K Commerce - Order Entry
Upon Application Oof Power, Load is Energized Immediately
When Thermostat Opens or on Power Interruption, Load is De-Energized and Time Delay Initiates
Load will be Energized Again after Delay Time has Elapsed
Cut Jumper for 120/240 Volt AC Circuit. Leave Jumper for 24 Volt AC Circuit
Upon Application of Power the Time Delay Initiates
Completion of Selected Delay Period the Load is Energized
Timer will Reset on Power Interruption or when Thermostat Disconnects
Cut Jumper for 120/240 Volt AC circuit. Leave Jumper for 24 Volt AC Circuit. Multi-Purpose Delay on Make Timing
Protects Air Conditioning, Refrigeration and Heat Pumps from Damage which may be Caused by Short Cycling of Compressor
For Compressor Staging and Stagger Starting Multiple Units
Helps to Reduce Power Surges in Multiple Compressor Applications
Fan Centers Provide Convenient Low Voltage Control One and Two Fan Motors and Auxiliary Circuits
Reliable, Compact Unit Consisting of a 24 Volt Control Transformer and a Plug-In Switching Relay Mounted on a 4 Inch Square Electrical Junction Box Cover
All Line Voltage Connections are Made Inside the Box with Color Coded Pre-Stripped Lead
Low Voltage Connections are Made at a Convenient Terminal Board Mounted to the Transformer
Line Voltage Connections Pre-Wired
Energy Limiting Class II Transformer Design
Color Coded Pre-Stripped Leads
Low Voltage Connections on Terminal Board
Line voltage connections pre-wired
Energy limiting class II transformer design
Color coded pre-stripped leads
Low voltage connections on terminal board